Planning grounds work around a school year

School grounds work happens in a window of roughly eight weeks, and every contractor in the region is trying to fit into it.
Why the window is so tight
Access is the constraint, not weather. Play structures, courts, handrails and site furniture are all in constant use during term. That leaves the summer break, and it leaves it for everyone at once.
What to do in the spring
- Walk the grounds and photograph everything that needs attention, in March or April.
- Prioritise by safety first — flaking coatings on handled equipment, corroded handrails, damaged surfacing — then appearance.
- Get quotes before the end of term, not on the last day.
- Batch it. One mobilisation covering structures, benches, racks and railings costs far less than three separate visits.
What can be done in term time
Anything removable can leave site and come back finished. Benches, gates, bike racks and sign panels do not need the grounds to be empty — they need a truck.
For grounds across Medicine Hat and the surrounding divisions, the working window is the summer break and nothing else, which makes booking early the whole game.
Talk it through with Matt.
Call 403-702-4435 or text a photo of the job for a straight answer.
Fastest way to a number: text a photo of what needs blasting to 403-702-4435.
Keep reading.

Refinishing playground equipment properly
Flaking paint on equipment children use is not a cosmetic issue. What proper preparation looks like on public play structures.
Read it
Rink boards, benches and the rest of the park inventory
Community assets that get refinished when someone finally complains. A practical view of what is worth cycling and when.
Read it
How often a deck needs refinishing in southeast Alberta sun
We get more sun than almost anywhere in Canada. What that does to a deck finish and a realistic cycle for horizontal surfaces.
Read it