What blasting a header actually involves

A header is not one surface. It is a frame with a large number of things bolted to it that would be damaged by media, and the job is as much masking as blasting.
What gets prepared
- Frame, backsheet and pan.
- Auger tube and flighting.
- Skid shoes, dividers and end panels.
- Guards and covers.
What has to be protected or removed
- Bearings, seals and any exposed shaft.
- Gearboxes and drive components.
- Hydraulic fittings, hoses and cylinders — particularly rod surfaces.
- Electrical, sensors and wiring looms.
- Knife sections and guards if they are staying.
The honest advice
The more that comes off before we arrive, the better the result and the lower the cost. Masking is careful, slow work. Anything you remove is something we are not masking around and not risking.
Headers coming off the fields around Irvine, Walsh and Seven Persons carry chaff packed into every cavity. That has to come out before anything else happens, and it is the part that decides how long the job takes.
Talk it through with Matt.
Call 403-702-4435 or text a photo of the job for a straight answer.
Fastest way to a number: text a photo of what needs blasting to 403-702-4435.
Keep reading.

Stock trailer floors: where the rot actually starts
The outside looks fine for years while the floor and lower rails go. What blasting finds, and why it is better to find it early.
Read it
The best time to blast farm equipment is when it is parked
Freeze-up to seeding is the only window where stripping and repainting equipment costs you nothing in working days. Most operators miss it.
Read it
Grain bin exteriors: what maintenance actually buys you
Bin sheeting, legs and hoppers corrode quietly. What is worth preparing and coating, and what is better left alone.
Read it