Hay trailer decks: steel, wood, and preparing each

Plenty of flat decks and hay trailers are steel frames with timber decking. That combination is completely normal and it changes how the job runs.
Two materials, two settings
Steel frame work runs dry at higher pressure. Timber needs wet, low pressure, and softer media. Those are not the same setup, so a mixed deck is genuinely two operations rather than one pass.
The usual decision
Most owners are replacing tired decking anyway. If that is the plan, pull the boards first — it gives us clean access to the crossmembers underneath, which is exactly where corrosion sits and exactly what you want coated before new timber goes on.
If the timber is staying
It can be stripped back to fresh grain, and the result is genuinely good. It costs more than steel-only because of the change in setup, and it needs sealing afterwards reasonably promptly.
Bale decks running the highways between Medicine Hat, Redcliff, Bow Island and Brooks see enough road salt and enough loading abrasion that the deck and the frame usually need different treatment on the same trailer.
Talk it through with Matt.
Call 403-702-4435 or text a photo of the job for a straight answer.
Fastest way to a number: text a photo of what needs blasting to 403-702-4435.
Keep reading.

Stock trailer floors: where the rot actually starts
The outside looks fine for years while the floor and lower rails go. What blasting finds, and why it is better to find it early.
Read it
The best time to blast farm equipment is when it is parked
Freeze-up to seeding is the only window where stripping and repainting equipment costs you nothing in working days. Most operators miss it.
Read it
Grain bin exteriors: what maintenance actually buys you
Bin sheeting, legs and hoppers corrode quietly. What is worth preparing and coating, and what is better left alone.
Read it