A maintenance schedule for a commercial lot

Asphalt driveway cleaned and sealed

Parking lot replacement is one of the larger unplanned capital items a property owner faces, and it is largely avoidable with a schedule.

Annually

  • Sweep and clear, particularly at edges and drainage points where debris holds water.
  • Walk the lot in spring and photograph any new cracking.
  • Clear vegetation from cracks and joints before it widens them.
  • Check that drainage still works and water is not ponding.

Every two to four years

  • Crack fill.
  • Seal, depending on traffic volume and exposure.
  • Restripe — faded lines are a liability question as much as an appearance one.

As required

  • Patch localised failures before they spread.
  • Address any area where water is standing after rain.
Water is what destroys a lot. Almost every maintenance item on this list is really about keeping water out or moving it off.

Written for the kind of lots through Box Springs Business Park, along Dunmore Road and out in Redcliff, where the surface is doing real duty and closing it for a week is not an option.

Budget noteSealing on a cycle is an operating expense. Replacing a failed lot is a capital project. The schedule is what keeps it in the first category.
Rush service available

Talk it through with Matt.

Call 403-702-4435 or text a photo of the job for a straight answer.

Call 403-702-4435 Text a Photo Request a Quote

Fastest way to a number: text a photo of what needs blasting to 403-702-4435.

Call Now Text a Photo